MANILA, Philippines — Repairs on the Chinese Coast Guard (CCG) ship that collided with another Chinese ship in Bajo de Masinloc (Panatag Shoal) early this August may take up to two months, a Philippine Navy official said on Thursday.
In an online interview, Rear Admiral Roy Vincent Trinidad, Philippine Navy spokesman for the West Philippine Sea (WPS), gave the estimate after Reuters reported that the ship was currently being repaired at a naval base in China’s Hainan Island.
Repairs on Chinese ship in Bajo de Masinloc collision may take 2 months - PH Navy
“Generally, I would say, around one to two months,” he said. , This news data comes from:http://aichuwei.com
Repairs on Chinese ship in Bajo de Masinloc collision may take 2 months - PH Navy
On August 11, the CCG ship with bow number 3104 collided with a People’s Liberation Army (PLA) Navy warship as they were chasing the Philippines’ BRP Suluan on a mission to give aid to fisherfolks in Bajo de Masinloc.

The damage sustained by the CCG ship made it “unseaworthy,” according to Philippine Coast Guard (PCG) spokesman for the WPS Jay Tarriela.
Trinidad however noted that repairs would be longer if more crucial parts of the ship were damaged.
“What is important here is the alignment of the shafting, so if there will be damages or misalignment to that, that would entail more repair work,” Trinidad said.
Videos showed four CCG personnel disappear from the impact of the collision.
Although the Chinese government has yet to confirm any casualties, Armed Forces of the Philippines Chief Romeo Brawner said they received reports that two had died and two were still left missing.
- Marcos signs mining tax regime law
- 102-year-old becomes oldest person to summit Mount Fuji
- OVP ready to submit to lifestyle check if ordered, no word from Sara
- UN force in Lebanon slams Israeli drone attack on peacekeepers
- Vietnam marks 80th independence anniversary with huge parade
- MMDA asks LTO to sanction motorist in altercation with traffic enforcer in San Juan
- Vico Sotto could challenge VP Sara in 2028 race – survey
- Suspect in 2012 killing of Dutch aid worker freed
- Marcos sacks PNP Chief Torre, saying it was 'difficult but necessary'
- LPA off Leyte has low chance of becoming cyclone within 24 hours —Pagasa